Substations and electrical contractors
Teams working near or on energised systems where isolation and earthing must be controlled.
SafeCore Solutions prepares Permit to Work (PTW) systems and Lockout/Tagout (LOTO) procedures for electrical, mechanical and hazardous work in Pakistan and internationally. They make sure dangerous energy is isolated and every high-risk job is authorised before it starts.
Request ConsultationMany serious incidents on energy and industrial sites happen when equipment is thought to be isolated but is not, or when two teams work on the same system without knowing about each other. A Permit to Work system and a Lockout/Tagout procedure exist to stop exactly this, but only if they are simple enough to use and strict enough to be trusted.
We design the permit types your site needs — general, hot work, electrical, excavation, confined space, work at height, lifting — with clear roles for the issuer, receiver and area authority. The LOTO procedure defines energy sources, isolation points, lock and tag rules, verification of zero energy and the safe removal of locks, including group isolation for larger jobs.
Teams working near or on energised systems where isolation and earthing must be controlled.
Operating facilities running maintenance while production continues.
Large sites with hot work, excavation and lifting operations happening at once.
Contractors joining a client's permit system who need their own compatible procedures.
We review your equipment, energy sources, existing permits and how work is currently authorised.
Permit types, authorisation levels and isolation rules are defined to fit your site.
Procedures and permit forms are drafted in plain language, ready for printing.
We help brief permit holders and provide an audit checklist to keep the system honest.
PTW and LOTO are core to the power-sector background of our HSE lead, gained on SEC substations and OHTL work in Saudi Arabia and as SEC Approved HSE Manager for ONEIC on Majan Electricity and Mazoon Electricity projects in Oman.
See the full experience timelineA practical guide to Permit to Work systems: what they are, the main permit types, the step-by-step permit cycle and the mistakes that cause incidents.
Step-by-step Lockout/Tagout (LOTO) procedure for electrical work: preparation, isolation, locks and tags, test for dead, earthing and safe re-energisation.
Share your scope and client requirements. We’ll reply with a practical plan and timeline.