Construction contractors
Civil, structural and MEP contractors that must submit an assessment for each activity before work.
SafeCore Solutions prepares risk assessments, job safety analyses (JSA/JSP) and hazard analyses for construction, energy and industrial activities in Pakistan and internationally. They identify the real hazards of each task and set practical controls your crews can apply.
Request ConsultationRisk assessment is the foundation of every other HSE document. If hazards are missed here, the permit, the method statement and the toolbox talk will miss them too. Too often, risk assessments are copied between projects and filled with generic controls such as "be careful" that give no real protection.
We work task by task. A job safety analysis breaks an activity into steps, identifies what can go wrong at each step and assigns a specific control and responsible person. For broader activities we prepare a matrix-based risk assessment with initial and residual risk ratings, and for critical tasks we add a deeper hazard analysis so management understands where the highest exposure sits.
Civil, structural and MEP contractors that must submit an assessment for each activity before work.
Teams working near energised equipment or at height on towers and structures.
Plants and warehouses reviewing maintenance, chemical handling and shutdown work.
Organisations whose risk assessments are generic, copied or no longer match the work.
We list the activities in your scope and identify which are routine and which are critical.
Each step is examined for people, equipment, energy, environment and chemical hazards.
Controls are chosen using the hierarchy of controls and residual risk is rated honestly.
Assessments are turned into briefing sheets and reviewed when the work or conditions change.
Our HSE lead has approved and challenged thousands of task risk assessments on Saudi and Omani power, construction and utility projects, including SEC and Saudi Aramco client work where JSA quality is closely audited.
See the full experience timelineA practical guide to Permit to Work systems: what they are, the main permit types, the step-by-step permit cycle and the mistakes that cause incidents.
Step-by-step Lockout/Tagout (LOTO) procedure for electrical work: preparation, isolation, locks and tags, test for dead, earthing and safe re-energisation.
A practical HSE plan checklist for construction and power projects: organisation, risk management, PTW, emergency response, training, monitoring and reporting.
Share your scope and client requirements. We’ll reply with a practical plan and timeline.